Delays for Adsborough

Due to the lockdown, all work has been suspended and we will continue to rent the location while we adapt to the current climate. This is due to work being postponed and delayed on other sites, which are required to connect Adsborough. We expect to commence trials shortly and work will commence as soon as possible.

Mains power is yet to be connected with no definitive date, we have installed a solar array however this less than ideal for reliable power and needs to be scaled up. With work slowing down, we will rethink our plans and designs and will provide updates shortly.